Skilled stone contractors Tudor Stonework have shared a little film that tells the story of how JFA’s designs were executed to create a new floor for the Burlington Arcade.
Completed in 2015, almost 200 years after the arcade was originally built, the geometry, tonal variation and craftsmanship of the floor respond sympathetically to the existing Regency architecture.
Tudor Stonework’s craftsmanship was superb.